DESIGN-BUILD: DENTAL PROGRAM RENOVATION
Design and renovate 3 classroom spaces (approx 2,336 sq. ft.) at Reynolds High School for use as a lab classroom for up to 30 students at 8-10 operatories. The project scope includes providing design and construction including appropriate layout, furnishings, and hands-on training zones including installation of industry-standard equipment (dental chairs, sinks, x-ray and sterilization equipment, lighting, and digital systems) with necessary plumbing, electrical, and ventilation upgrades.
The project may require work to be done while school is in session and considerations will need to be made to limit the impacts to the students, teachers, and school staff.